About
Construction · Contracting · Logistics, Beşiktaş, Istanbul

Corporate
Our experience across residential, commercial and industrial buildings rests on sound engineering, transparent budgeting and on-time delivery. The long-standing relationships we build with our clients are our most valuable reference.
Meet the Team0+
Years of Experience
0+
Delivered Projects
0+
m² Built Area

Our Mission
Our mission is to build earthquake-safe, energy-efficient and long-lasting buildings within the committed schedule and budget, with a zero-incident goal. On every site we treat independent quality control, digital site tracking and transparent client communication as standard.
The construction schedule and milestone dates are shared in writing with the contract; weekly progress reports go to the client.
Itemised estimate; brands and standards are written in the technical specification annexed to the contract. No surprise costs.
C30 ready-mix concrete, inspection samples and 7-day strength reports at every pour; double-layer SBS membrane, tested services.
Daily hazard assessment and a zero lost-time incident goal; we carry responsibility for neighbouring structures during excavation and demolition.
Over the years
Founded in Beşiktaş by three partners; our first job was a six-storey apartment block in Mecidiye.
An 8,000 m² steel-roofed warehouse in Gebze: our first long-span reference.
96-unit at-risk building renewal in Kartal; a single contract with the owners.
Design and construction at the same table: partnership with MEKA architecture.
Design Partner
Two teams in the same building, at the same table: the architectural idea is born at the drawing board and rises on site with the same discipline. For the client: one contract, one schedule, one point of contact.
Visit MEKA architecture
Process
Licensed soil survey approved by the chamber; structural design is based on that report.
C30 concrete and certified rebar; every floor advances with inspection samples and strength reports.
Finishes, services and landscaping completed; test reports and photo/video records delivered in the handover file.